<?xml version="1.0" encoding="UTF-8"?><!-- generator="wordpress/2.3.2" -->
<rss version="0.92">
<channel>
	<title>Blogs</title>
	<link>http://www.critical-path.co.uk/blogs</link>
	<description>Just another WordPress weblog</description>
	<lastBuildDate>Tue, 14 Apr 2009 13:12:05 +0000</lastBuildDate>
	<docs>http://backend.userland.com/rss092</docs>
	<language>en</language>
	
	<item>
		<title>Return To The Wyllyotts, 7th March 2009</title>
		<description>Headlining a stunning line up of local talent at the Wyllyotts Centre Potters Bar, Critical Path played to a seething audience of 100's in what could be described as their most electric gig so far. The audience were treated to a full catalogue of all the bands old and new ...</description>
		<link>http://www.critical-path.co.uk/blogs/?p=16</link>
			</item>
	<item>
		<title>Album Launch Breaks All Records!</title>
		<description>The launch of the long awaited debut album "Something as Simple as Life" was hailed as a massive success as Critical Path topped the bill of six local bands that proved to be a record breaker. Over 300 teenagers queued outside the Wyllyotts Theatre in Potters Bar to hear Point of Impact, ...</description>
		<link>http://www.critical-path.co.uk/blogs/?p=15</link>
			</item>
	<item>
		<title>Camden Once More                            4/7/08</title>
		<description>Back to Camden for Path fans, this time at Tommy Flynns and on a large bill. Going on late at night can mean lots of things to a young band, usually the crowd is well bladdered and can be difficult,can be indifferent or as in this case appreciative of a ...</description>
		<link>http://www.critical-path.co.uk/blogs/?p=14</link>
			</item>
	<item>
		<title>High Standard kept up in Walthamstow</title>
		<description>Going to Walthamstow on a Thursday night from the other side of London is not normally something to get excited about, but this is not so if you follow Critical Path. Taking full advantage of a large stage and top quality sound the band were on top form, playing to the ...</description>
		<link>http://www.critical-path.co.uk/blogs/?p=13</link>
			</item>
	<item>
		<title>Critical Path Raise Their Game at The Green Room</title>
		<description>Saturday 19th April.

 Fans of Critical Path couldn't beleive their luck at a packed Green Room last Saturday as the band surely played their finest gig. The two opening acts, Bomb Dog and Pirate Radio whipped up the crowd which included V.I.Ps from Chiltern FM. Such was the quality of these bands ...</description>
		<link>http://www.critical-path.co.uk/blogs/?p=11</link>
			</item>
	<item>
		<title>It&#8217;s Grand up North!</title>
		<description>Saturday the 12th April saw Critical Path making their debut beyond the Watford Gap! "The Studio" in Peter Street, Central Manchester is a recognised "hot spot" for new unsigned talent. Playing to a packed house of Manchester university students, and some familiar faces from down south! The band played a storming set ...</description>
		<link>http://www.critical-path.co.uk/blogs/?p=10</link>
			</item>
	<item>
		<title>Update!</title>
		<description>Recent cancellations and changes to previously advertised dates mean the band are currently awaiting confirmation of all the gigs booked for this summer season. Arrangements are in hand to play gigs in Manchester and Brighton this summer as well as the usual London haunts! A full and regularly updated list will ...</description>
		<link>http://www.critical-path.co.uk/blogs/?p=8</link>
			</item>
	<item>
		<title>Return To The Green Room</title>
		<description>Just under two years ago four fresh faced boys played their first live gig to a paying audience at The Green Room, Welwyn Garden City. On Saturday 2nd February 2008 they returned as seasoned performers. Now regulars on the famous London unsigned circuit, Critical Path showed us what they have learnt ...</description>
		<link>http://www.critical-path.co.uk/blogs/?p=7</link>
			</item>
</channel>
</rss>
